Plumbing Task List
Phased tasks · code hold points
No hold points outstanding. 5 tasks still open.
Tasks
5
Open
5
Overdue
0
Hold points open
0 / 0
1Job detailsOverdue is measured against the date below, not today's clock — a printed list keeps saying what it said.PTL-2026-001
Task list #
Project name
Your company
Phone
Customer / owner
2Hold pointsCodeHold points on this sheet follow the 2018 International Plumbing Code: Section 107.1 requires permitted work to remain accessible and exposed until approved, Section 107.2 sets the underground, rough-in and final inspections, and Section 312 sets the tests. Chapter 1 was renumbered in the 2021 IPC and jurisdictions amend both chapters, so the adopted code and the authority having jurisdiction govern. This sheet is the contractor’s own record of scheduling and sign-off. It is not an inspection approval, not a test report, and it does not certify compliance.Tests and inspections that must pass before the work is covered. Add the ones this job needs.0 of 12 added
Underground inspection called and approved before backfill
Below-slab DWV water test — 10 ft head, held 15 min
Building sewer gravity test — 10 ft head, held 15 min
Forced (pumped) sewer test — 5 psi over pump rating, 15 min
3Tasks by phaseEvery row you add stays visible. Flag anything that has to be witnessed before it is covered.0 of 5 done
Underground / below slab
In progress0 of 1 doneLay building drain to grade and bed the trenchHighNot started
Task
Assignee
Phase
Due date
Priority
Status
Rough-in
In progress0 of 1 doneSet DWV stacks, branches and vents through the roofHighNot started
Task
Assignee
Phase
Due date
Priority
Status
Top-out
In progress0 of 1 doneRun and support hot/cold water distribution to every fixtureMediumNot started
Task
Assignee
Phase
Due date
Priority
Status
Trim / fixture set
In progress0 of 1 doneSet fixtures, trim and shutoffs; fill trapsMediumNot started
Task
Assignee
Phase
Due date
Priority
Status
Final
In progress0 of 1 doneLabel shutoffs and hand over the fixture and valve listLowNot started
Task
Assignee
Phase
Due date
Priority
Status
Sign-off
Signed off by
Date