Plumbing Method Statement Template

Build and download a free plumbing method statement, document the safe sequence for a repipe or major installation, with PPE, permits, and the method, hazards, and controls for each step. PDF, Excel, or Word export.

Where should we send it?

Add your email to download this template. It is free, and you only have to do this once.

We use it to send you the occasional template and product update. See our privacy policy.

Plumbing method statement

Document the safe way to do the job, the step-by-step method, the hazards and controls for each step, PPE, and permits your crew and the site need before work starts.

Method Statement

Plumbing · Safe work method statement

Document #

Date

Job title

Location

Prepared by

Reviewed byoptional

Contractor (your company)

Phone

License #optional

Scope of work

Required PPE

One item per line, rendered as bullets.

Permits & approvals

One permit per line, rendered as bullets.

Method steps

5 steps
1. Shut off & drain the system55 words

Task

Method

Hazards

Controls

2. Open walls & remove old pipe47 words

Task

Method

Hazards

Controls

3. Rough-in new PEX51 words

Task

Method

Hazards

Controls

4. Pressure test50 words

Task

Method

Hazards

Controls

5. Patch & restore49 words

Task

Method

Hazards

Controls

Emergency procedures

Prepared-by signature

Print name

-

Date

2026-11-02

Customize:

Download your method statement:

What's included

  • Company block and document number
  • Job title, location, prepared-by, and reviewed-by
  • A scope-of-work statement
  • Required PPE and permits, one per line
  • Sequenced, numbered work steps, up to 20
  • Method, hazards, and controls documented for each step
  • An emergency-arrangements section
  • Prepared-by signature block
  • Company logo upload and free-form notes
  • Export to PDF, Excel (.xlsx), or Word (.docx)

How to use this template

  1. 1

    Describe the job

    Add your company, the job title and location, who prepared and reviewed it, and a clear scope for this plumbing task.

  2. 2

    Set PPE and permits

    List the personal protective equipment and any permits the work requires, one per line.

  3. 3

    Build the method step by step

    Break the job into a safe sequence. For each step, describe the method, the hazards, and the controls that keep the crew safe.

  4. 4

    Sign and brief the crew

    Add the emergency plan, sign as the preparer, and export a clean PDF, Excel, or Word file to brief the crew before work starts.

Why plumbers should use a method statement

Repipes, water-heater work, and drain jobs carry real hazards, hot work, confined spaces, water damage, and working around other trades. A method statement lays out the safe sequence with the hazards and controls at each step so the crew is briefed before they start.

On commercial and new-construction sites it is frequently mandatory. A clear method statement is what gets your crew approved to mobilize instead of waiting at the gate.

Use this free plumbing method statement to plan and brief your bigger jobs. Pair it with CloseCrew so Crew, your AI receptionist, answers every call and books the work while your crew stays safe and productive.

Related templates

More free downloads for your PLUMBING template library.

Worth asking before you book

Method Statement Template FAQs

A method statement, sometimes called a safe work method statement or SWMS, describes how a plumbing task will be carried out safely, step by step, with the hazards and controls for each step. It is used to plan the work and brief the crew before they start.
A risk assessment identifies hazards and scores the risk; a method statement describes the safe sequence of work and the controls at each step. They are complementary, the risk assessment informs the controls that appear in the method statement.
For higher-risk or complex work, crane lifts, service changeovers, confined spaces, or anything a general contractor or client requires. Many commercial sites will not let a crew start without one on file.
A competent person who understands the task prepares it, and a supervisor or safety lead typically reviews it. The whole crew should be briefed on it before the work begins, which is why this template keeps it clear and printable.
Yes. Build and download it free as a PDF, Excel, or Word file, no login. The steps, PPE, and permits are pre-filled for common plumbing work and fully editable.
Where to next

Watch the work before you hear from us

Diagnostics, installs and the odd bad attic, from contractors who film their own jobs.

Follow the work