Inspection Checklist
HVAC · Preventive Maintenance
Checklist #
INS-2026-001
Overall
Not set
Completion
0%
Inspection date
2026-07-29
Inspection detailsAdd date & technician
Checklist #
Inspection date
Technician
Permit #
Inspection type
Overall result
Contractor
Phone
License #
Customer
Phone
Pre-Inspection & Safety5 items
Permit and approved plans on site (when required)
Customer notified and work area accessible
PPE worn and electrical/gas lockout verified
Service disconnect accessible and labeled
Work area clear of debris and combustibles
Cooling System6 items
Condenser coil clean and unobstructed
Refrigerant lines insulated and supported
Outdoor fan blade and motor condition
Compressor starts and runs without abnormal noise
No visible refrigerant oil stains or leaks
Condensate drain clear and properly trapped
Heating System5 items
Heat exchanger visual inspection — no cracks or rust-through
Ignition sequence and flame sensor operation
Flue / vent piping secure with proper draft or sealed combustion
Gas connections tight — leak check performed
Limit and rollout switches functional
Technician signature
2026-07-29
Customer signature
2026-07-29


