Build and download a free HVAC equipment schedule, one line per unit with tag, capacity, airflow, electrical and efficiency data. Tons, CFM per ton, MCA and MOCP are calculated as you type, and anything outside the design band or below the federal minimum is flagged. PDF, Excel, or Word export.
List every unit on the job with its tag, location, capacity, airflow, electrical and efficiency data. Tons and CFM per ton are calculated as you type, nameplate MCA and MOCP are cross-checked against NEC 440, and anything outside the design band or below the federal minimum is flagged.
HVAC · Equipment Schedule
Units
1
Total cooling
0
Total tons
Not set
Total CFM
0
Group MCA
Not set
Flagged
0
Add to your schedule:
Download your schedule:
Free · no signup · fully editable
Add your company, the project and client, a schedule number, and who prepared it. Pick the DOE efficiency region, it decides which minimum every unit is checked against.
Start from an equipment type preset, split AC, heat pump, furnace, RTU, mini-split and the rest, or add a blank row. Give each one a tag and the area it serves.
Type the cooling capacity in BTU per hour and nominal tons appear automatically. Add blower CFM and the schedule calculates CFM per ton, flagging anything outside the 350 to 450 design band.
Open Details for make, model, serial, voltage, compressor RLA, refrigerant, and the AHRI reference number. MCA and MOCP are calculated from the RLA per NEC Article 440, and the efficiency rating is checked against the federal minimum.
Anything out of band or below the minimum is listed at the bottom of the schedule. Add remarks, sign off, and download a landscape PDF, an Excel file for the submittal, or Word.
The equipment schedule outlives the job. Long after the invoice is paid, it is the sheet the next technician opens to find out what is on the roof, what refrigerant is in it, what filter it takes, and whether the warranty is still live. It is also what the inspector, the commissioning authority, and the rebate program each ask for in a slightly different format. Getting it right once, in a form you can hand over, saves the callbacks.
Most free equipment lists are a spreadsheet with column headings and nothing behind them. This one does the arithmetic that actually goes wrong in the field. Nominal tons come straight off capacity, twelve thousand BTU per hour is one ton of refrigeration, and CFM per ton is checked against the real design band rather than the four hundred rule of thumb, because ACCA's own guidance is to run nearer three fifty in humid climates for latent capacity and nearer four fifty where the air is dry. On the electrical side, MCA follows NEC 440.33 at a hundred and twenty five percent of the compressor rated load current plus the other loads, and MOCP follows 440.22(A), which permits a device "not exceeding" a hundred and seventy five percent, so the answer rounds down to a standard NEC 240.6(A) size, not up. That single detail is the one most calculators get backwards.
It also checks efficiency against the right number. The DOE 2023 standards are regional for split-system air conditioners: thirteen point four SEER2 in the North, fourteen point three in the Southeast and Southwest under forty five thousand BTU per hour, with an EER2 floor on top in the Southwest. A unit that is perfectly legal in Michigan cannot be installed in Georgia. Pick your region and the schedule flags it. Build it here, then let CloseCrew handle the phones so Crew books the next job while you finish this one.
More free downloads for your HVAC template library.
Bill customers with line items, tax, and payment terms built for HVAC jobs.
Diagnostics, installs and the odd bad attic, from contractors who film their own jobs.