Electrical Labor Cost Calculator

See what the labor on a job really costs — enter your electricians' base wage, labor burden, hours, and crew size to get the total burdened labor cost, the loaded cost per hour, and labor as a percent of the job price. Free, no signup.

Calculator

Labor Cost Calculator

Free
Loaded hourly cost$42.24
$42.24/hr loaded8 crew-hrs

Total labor cost for this job

$338

$256 wages + $82 burden

Add a job price to see labor as a % of the sale
Cost per worker4 hr each × $42.24
$169
Cost at a glance
Total labor cost
$338Loaded hourly cost × total crew-hours
Loaded hourly cost
$42.24Base wage + 32.0% burden
Total crew-hours
84 hr × 2 workers
Base wage cost
$256Before any burden — what shows on the paycheck
Labor burden cost
$82Payroll taxes, workers’ comp, and benefits on this job
  • Base wages: $256
  • Labor burden: $82

Base wages are only part of the cost — the burden (taxes, comp, benefits) is the piece most owners forget when they price a job.

Electrician wage
$28–45/hr base
Typical labor burden
28–38% of wages
Loaded cost
$47–55/hr journeyman
Labor % of revenue
25–35% target

Electrical loaded cost ≈ base wage × 1.28–1.38

  • Enter wage and burden

    Add the base hourly wage and your labor burden % — payroll taxes, workers’ comp, and benefits as a share of wages. Build the burden number in the Employee Cost Calculator if you don’t know it.

  • Add hours and crew

    Enter the hours each worker spends on the job (including setup and cleanup) and how many workers are on it at that wage.

  • See the total and the labor share

    Get the total burdened labor cost, the loaded cost per hour and per worker, and — if you add the job price — labor as a percent of the sale against the 25–35% benchmark.

How it works

  1. 1

    Enter wage and burden

    Add the base hourly wage and your labor burden % — payroll taxes, workers’ comp, and benefits as a share of wages. Build the burden number in the Employee Cost Calculator if you don’t know it.

  2. 2

    Add hours and crew

    Enter the hours each worker spends on the job (including setup and cleanup) and how many workers are on it at that wage.

  3. 3

    See the total and the labor share

    Get the total burdened labor cost, the loaded cost per hour and per worker, and — if you add the job price — labor as a percent of the sale against the 25–35% benchmark.

How electrical contractors calculate labor cost per job

The labor on a job costs far more than the wage on the paycheck. The real number is the loaded (burdened) hourly cost — base wage plus payroll taxes, workers’ comp, and benefits — multiplied by the hours worked and the crew size. Skip the burden and you will underprice every job by 25–40%, because that is the share of wages the burden usually adds.

This calculator uses the standard job-labor-cost formula: loaded hourly cost = base wage × (1 + labor burden %), then total labor cost = loaded cost × hours × crew. It also shows labor as a percent of the job price so you can check it against the 25–35% most healthy home-service shops target. It is distinct from the Labor Rate Calculator (which sets a billable $/hr) and the Employee Cost Calculator (which builds the per-person annual cost and the burden % this tool asks for). Use all three together to price labor accurately.

Related tools

More free resources to help you price jobs, stay organized, and capture leads.

Business Templates

Free invoices, estimates, and work orders for your trade.

Browse templates

AI Receptionist

Let Larry answer every call while you focus on the job.

Learn more

Contractor Blog

Guides on pricing, hiring, marketing, and operations.

Read guides

Electrical Licensing

State licensing requirements, exams, and renewal rules for electrical contractors.

View states

Labor Cost Calculator FAQs

How do I calculate labor cost for a electrical job?

Multiply the loaded hourly cost by the total crew-hours. Loaded hourly cost = base wage × (1 + labor burden %). Example: a $30/hr wage at 35% burden is $40.50/hr loaded; a 2-worker crew for 4 hours each is 8 crew-hours, so 8 × $40.50 = $324 total labor cost. Add materials and overhead separately to price the whole job.

The Employee Cost Calculator builds the fully-burdened cost of a person (per year and per hour) and the burden %. The Labor Rate Calculator turns that into a billable $/hr to charge customers. This Labor Cost Calculator uses your cost per hour to total the labor on one job — hours × crew × loaded rate. Cost, not price.

For most home-service trades, labor burden runs 25–40% of base wages — payroll taxes (~9–10%), workers’ comp (varies by trade and state), plus benefits. Use the Employee Cost Calculator to build your exact number, then enter it here.

Most healthy home-service shops keep labor around 25–35% of the job price, leaving room for materials, overhead, and profit. If labor is pushing past 40% of the price, the job is likely under-priced or over-crewed — raise the price or tighten the hours.

Stop missing calls while you run the numbers. Let Larry, your AI receptionist, answer every electrical lead.