Electrical Project Schedule
Phases · hold points · change orders
4 phases cannot close out — 5 hold points still open. Permit issued (IBC 105.1)
Tasks done
0 / 0
Complete
0%
Overdue
0
Hold points open
5 / 5
Earliest planned start
Latest planned finish
Project duration
1Project detailsOverdue and slip are graded against the status date below, never against the clock.PRJ-2026-001
Project #
Project name
Your company
Phone
Owner / general contractor
2Phases, tasks & hold pointsEvery row you add stays visible. An open hold point stops its phase closing out and names itself.5 phases · 0 tasks
0 of 0 done · 0%
- Hold point open: Permit issued (IBC 105.1)
- Hold point open: Submittals / shop drawings returned approved (Contract)
| Task | Owner / crew | Planned start | Planned finish | Actual finish | Days | % | Status | Slip | |
|---|---|---|---|---|---|---|---|---|---|
Hold points on this phaseCode hold points on this sheet follow the 2021 International Building Code administrative chapter: Section 105.1 requires the permit before work starts, Section 110.6 stops work going beyond the point of each successive inspection without the building official’s approval, Section 110.3.12 sets the final inspection and Section 111.1 the certificate of occupancy. The mechanical rough-in gate is 2021 IMC 112.2.2. Editions, amendments and the authority having jurisdiction govern — the IPC renumbered its inspections section between the 2018 and 2021 editions, and the NEC publishes no inspection schedule at all (its Article 80 is a model law that applies only where adopted). Gates marked Contract or AHJ carry no code citation because none exists for them. This sheet is the contractor’s own schedule and sign-off record. It is not an inspection approval, not a certificate of occupancy, and it does not certify compliance.2 of 2 open
0 of 0 done · 0%
- Hold point open: Electrical inspection approved by the AHJ (AHJ / local)
| Task | Owner / crew | Planned start | Planned finish | Actual finish | Days | % | Status | Slip | |
|---|---|---|---|---|---|---|---|---|---|
Hold points on this phaseCode hold points on this sheet follow the 2021 International Building Code administrative chapter: Section 105.1 requires the permit before work starts, Section 110.6 stops work going beyond the point of each successive inspection without the building official’s approval, Section 110.3.12 sets the final inspection and Section 111.1 the certificate of occupancy. The mechanical rough-in gate is 2021 IMC 112.2.2. Editions, amendments and the authority having jurisdiction govern — the IPC renumbered its inspections section between the 2018 and 2021 editions, and the NEC publishes no inspection schedule at all (its Article 80 is a model law that applies only where adopted). Gates marked Contract or AHJ carry no code citation because none exists for them. This sheet is the contractor’s own schedule and sign-off record. It is not an inspection approval, not a certificate of occupancy, and it does not certify compliance.1 of 1 open
0 of 0 done · 0%
- Hold point open: Long-lead equipment delivered to site (Contract)
| Task | Owner / crew | Planned start | Planned finish | Actual finish | Days | % | Status | Slip | |
|---|---|---|---|---|---|---|---|---|---|
Hold points on this phaseCode hold points on this sheet follow the 2021 International Building Code administrative chapter: Section 105.1 requires the permit before work starts, Section 110.6 stops work going beyond the point of each successive inspection without the building official’s approval, Section 110.3.12 sets the final inspection and Section 111.1 the certificate of occupancy. The mechanical rough-in gate is 2021 IMC 112.2.2. Editions, amendments and the authority having jurisdiction govern — the IPC renumbered its inspections section between the 2018 and 2021 editions, and the NEC publishes no inspection schedule at all (its Article 80 is a model law that applies only where adopted). Gates marked Contract or AHJ carry no code citation because none exists for them. This sheet is the contractor’s own schedule and sign-off record. It is not an inspection approval, not a certificate of occupancy, and it does not certify compliance.1 of 1 open
0 of 0 done · 0%
| Task | Owner / crew | Planned start | Planned finish | Actual finish | Days | % | Status | Slip | |
|---|---|---|---|---|---|---|---|---|---|
Hold points on this phaseCode hold points on this sheet follow the 2021 International Building Code administrative chapter: Section 105.1 requires the permit before work starts, Section 110.6 stops work going beyond the point of each successive inspection without the building official’s approval, Section 110.3.12 sets the final inspection and Section 111.1 the certificate of occupancy. The mechanical rough-in gate is 2021 IMC 112.2.2. Editions, amendments and the authority having jurisdiction govern — the IPC renumbered its inspections section between the 2018 and 2021 editions, and the NEC publishes no inspection schedule at all (its Article 80 is a model law that applies only where adopted). Gates marked Contract or AHJ carry no code citation because none exists for them. This sheet is the contractor’s own schedule and sign-off record. It is not an inspection approval, not a certificate of occupancy, and it does not certify compliance.none
0 of 0 done · 0%
- Hold point open: Final inspection approved (IBC 110.3.12)
| Task | Owner / crew | Planned start | Planned finish | Actual finish | Days | % | Status | Slip | |
|---|---|---|---|---|---|---|---|---|---|
Hold points on this phaseCode hold points on this sheet follow the 2021 International Building Code administrative chapter: Section 105.1 requires the permit before work starts, Section 110.6 stops work going beyond the point of each successive inspection without the building official’s approval, Section 110.3.12 sets the final inspection and Section 111.1 the certificate of occupancy. The mechanical rough-in gate is 2021 IMC 112.2.2. Editions, amendments and the authority having jurisdiction govern — the IPC renumbered its inspections section between the 2018 and 2021 editions, and the NEC publishes no inspection schedule at all (its Article 80 is a model law that applies only where adopted). Gates marked Contract or AHJ carry no code citation because none exists for them. This sheet is the contractor’s own schedule and sign-off record. It is not an inspection approval, not a certificate of occupancy, and it does not certify compliance.1 of 1 open
3Change orders & RFIsAuto-calculatedTotals are accumulated in whole cents and divided once, so a list of change orders sums exactly. Open rows are reported separately as exposure rather than folded into the revised contract value, because a revised value that quietly includes an unapproved change order is how you end up billing for work nobody agreed to.Cost impact is signed — a credit is negative. Only approved rows move the contract value and the finish date.none logged
| Ref | Type | Description | Status | Cost impact | Days |
|---|
Contract position
Sign-off
Signed off by
Date