Inspection Checklist
Electrical · Preventive Maintenance
Checklist #
INS-2026-001
Overall
Not set
Completion
0%
Inspection date
2026-11-02
Inspection detailsAdd date & technician
Checklist #
Inspection date
Technician
Permit #
Inspection type
Overall result
Contractor
Phone
License #
Customer
Phone
Pre-Inspection & Site Safety4 items
Permit and approved plans on site (when required)
Panel de-energized before invasive inspection
PPE and arc-flash precautions observed
Work area clear and dry
Service Panel6 items
Panel cover secure, no missing knockouts
Circuits labeled on panel directory
Main and branch lugs torqued, no overheating signs
No double-tapped breakers or improper terminations
Ground and neutral bars correctly separated (if applicable)
Required working clearance maintained
Branch Circuits5 items
Wire gauge matches breaker rating
Cable / conduit protected from damage
Junction boxes covered with devices or blanks
GFCI / AFCI protection where required by NEC
Outlets and switches secure, no exposed conductors
Technician signature
2026-11-02
Customer signature
2026-11-02