Inspection Checklist
Electrical · Preventive Maintenance
Checklist #
INS-2026-001
Overall
Not set
Completion
0%
Inspection date
2026-07-29
Inspection detailsAdd date & technician
Checklist #
Inspection date
Technician
Permit #
Inspection type
Overall result
Contractor
Phone
License #
Customer
Phone
Pre-Inspection & Site Safety4 items
Permit and approved plans on site (when required)
Panel de-energized before invasive inspection
PPE and arc-flash precautions observed
Work area clear and dry
Service Panel6 items
Panel cover secure — no missing knockouts
Circuits labeled on panel directory
Main and branch lugs torqued — no overheating signs
No double-tapped breakers or improper terminations
Ground and neutral bars correctly separated (if applicable)
Required working clearance maintained
Branch Circuits5 items
Wire gauge matches breaker rating
Cable / conduit protected from damage
Junction boxes covered with devices or blanks
GFCI / AFCI protection where required by NEC
Outlets and switches secure — no exposed conductors
Technician signature
2026-07-29
Customer signature
2026-07-29